TET ecological continuity work item
🏗️ Point #works at the future fish pass 🏗️
 
🌱💧 Work on the ecological restoration is still in progress with the reinforcement of the left bank and the installation of riprap to stabilise the bank.
Under the Joffre bridge, a framework with sheet piles is being created to allow the construction of the future fish pass. 🐟

The latest news :